中文(中国)
Leverage high degrees of automation to establish industry workflows, built-in design checks, and adherence to projects standards in order to improve productivity.
And all the creation, editing, visualization, and publishing capabilities of MicroStation in one application.
Capabilities :
Gauging analysis ensures that the rolling stock proposed for your track will fit. Design data is combined with CAD models of proposed infrastructure changes to assess the viability of new or changed infrastructure.
Convert surveys of track data into full alignments using regression analysis. Determine the best fit geometry alignment of your track from a range of survey data types, including transition types and cant. You can then use this geometry to produce design changes.
Ensuring appropriate drainage is included within rail designs is vital to ensuring the availability of the railway. Preventing storm or floodwater from damaging your rail network through effective design will reduce maintenance costs and increase availability of the network.
Combine survey, design rules, and operational requirements to generate optimal geometry for your track. Use engineering workflows to produce horizontal and vertical alignments and cant design that comply with local design rules.
Create engineering deliverables for your rail projects, directly from design models. Contractual deliverables for rail schemesinclude geographic plans,sections,bills of quantities,stage works plans, and images These are deliveredwith controlled approval and distribution.
Deliver construction, refurbishment, and renewal information from designs directly to the construction sector.You can deliver tamping instructions directly to tamping machines for track realignment, or full scheme plans for major works or new rails.
Ensure that your design complies with all relevant rail standards. Ensure that design rules and clearance requirements have been adhered to, and use visualization to ensure that the proposed track, signaling, and electrification work with the existing infrastructure to deliver a drivable railway.











